Warehouse, Yard and Logistics Technology Systems

MTT delivers the wireless coverage, surveillance, vehicle access and cabling that distribution sites in Bahrain and Saudi Arabia depend on — designed for racking, high bays, yards and traffic that never stops for an installation.

In distribution, technology problems show up as time. A scanner that drops in an aisle, a gate queue that spills onto the road, a stock discrepancy with no usable footage, a dock door that nobody controls.

MTT (My Telecom Technology) designs for the warehouse as it operates: racking loaded, forklifts moving, doors open, and a yard that is a different RF and lighting environment from the building it serves.

The systems are layered to match how a distribution site actually runs: structured cabling and a fibre backbone feed the warehouse, gatehouse and yard buildings; wireless access points are positioned and validated with racking loaded so scanners and voice-pick devices roam cleanly between aisles; gate ANPR and barriers hand off vehicle records to the same access-control platform used on doors and cages; and cameras at dock faces, pick faces and weighbridges feed a control room or a manager's screen alongside the access and gate events, so a discrepancy can be checked from one place instead of three.

What we are asked to solve

The operational problems behind most warehousing & logistics enquiries.

Wireless that fails in the aisles

Coverage designed on an empty-building plan collapses once racking is loaded. Scanners drop, roaming stalls between access points, and pickers lose time to retries.

Gate queues and vehicle throughput

Manual checks and a single lane create queuing at peak, with no automated record of which vehicle entered and when.

Loss and dispute investigations

Camera coverage that shows movement but never gives a usable image at the dock face, pick face, cage or weighbridge.

Uncontrolled dock and yard access

Doors and pedestrian gates that are not on the access system, and drivers moving through areas they should never reach.

Cold, dusty and high-bay conditions

Equipment installed without regard for temperature, condensation, dust or mounting height, then failing early and needing access equipment to reach.

Growth that outran the infrastructure

Added mezzanines, new racking runs and extra offices served from a comms room and cabling that were sized years ago.

Quotes that hide the real scope

Wireless and camera proposals priced from a floor plan rather than a loaded-site survey, so the access point count or camera coverage promised on paper does not match what the aisles actually need.

MTT capabilities in this sector

Systems we design, install, test and maintain.

How the work is delivered

Survey to maintenance, documented at every step.

  1. Step 01
    Site survey

    An engineer attends site, records existing infrastructure, distances, containment, power and constraints, and agrees the operational objective with the people who will use the system.

  2. Step 02
    Design

    Layouts, schematics, equipment schedules and a bill of quantities are produced so the scope and the assumptions behind it are visible before anything is ordered.

  3. Step 03
    Supply

    Equipment is procured against the approved design, with lead times and any substitution agreed in writing rather than decided on site.

  4. Step 04
    Installation

    MTT field teams install to the approved drawings, with structured containment, labelled cabling and coordination around live operations and permit requirements.

  5. Step 05
    Testing & commissioning

    Cabling is tested, systems are configured and functional tests are witnessed and recorded so the delivered performance is documented, not assumed.

  6. Step 06
    Documentation

    As-built drawings, schedules, test results, configuration records and asset lists are handed over as the basis for future changes and maintenance.

  7. Step 07
    Training

    Operators and site technicians are trained on day-to-day use, routine checks and the correct escalation route.

  8. Step 08
    Maintenance

    Preventive and corrective cover under an annual maintenance contract keeps the system supported, with an agreed scope and spares position.

Survey with the racking in place

Wireless and camera design is validated in the loaded building. A survey of an empty shell produces a coverage plan that will not hold.

Access and working at height

High-bay mounting positions, access equipment and safe systems of work are planned before installation, not improvised on the day.

Deliverables at handover

As-built cabling and wireless heat maps, camera and coverage schedules, gate and access-control configuration records, cabling and fibre test results, and an asset register — so a second site can be brought up to the same standard without repeating the survey work.

Lifecycle and AMC coverage

Maintenance visits are scheduled outside peak dispatch windows and cover access point health and roaming performance, camera and storage health, gate and barrier mechanicals, and battery checks on any UPS-protected equipment, with a defined response time for faults that stop dispatch.

Phased cutover

Where a live site cannot stop, the design is delivered in phases with parallel running so dispatch is never dependent on a single switchover.

Who we usually work with

The people involved in this decision.

Operations & warehouse managers
Scanning reliability, gate throughput and installation that does not disrupt dispatch.
IT / network managers
Wireless capacity and roaming, switch and PoE budget, segmentation and remote visibility.
Security managers
Identifiable footage at loss-sensitive points, controlled doors and a defensible retention period.
HSE managers
Pedestrian and vehicle separation, restricted-zone monitoring and PPE compliance in yards and docks.
Facilities managers
Serviceable equipment at height, planned maintenance and spares.
Procurement teams
A scope that can be compared like for like, with clear exclusions and civil requirements.
Frequently asked

Warehousing & Logistics — common questions.

Let's start with your site.

Tell us what the site does and what is not working. An MTT engineer will arrange a survey or prepare a budgetary quotation from the information you provide.

Enquiries are handled through the protected MTT enquiry form. Your details are used only to respond to your request.